• Conduct detailed site survey and feasibility analysis for the existing overhead 11 KV line networks.
• Design the underground cable network with Ring Main System integration.
• Procure high-quality underground cables, GIS mapping equipment, and asset tagging materials.
• Load, transport, and store all materials securely at designated sites.
• Install underground cables, including trenching, laying, and connection to existing infrastructure.
• Perform comprehensive testing and commissioning to ensure system reliability.
• Document all work stages, including GIS mapping and asset tagging, as per GUVNL standards.
• Provide post-installation support and maintenance guidelines.
The project must adhere to technical specifications outlined in the tender documents, including safety standards and environmental regulations. The contractor shall coordinate with UGVCL officials and ensure minimal disruption during execution. The work must be completed within the stipulated timeline, with quality assurance at every stage.
| Parameter |
Specification |
| Cable Type |
High Voltage Underground Cable |
| GIS Mapping |
Integrated with Geo Urja Mapping System |
| Asset Tagging |
Using GUVNL-developed Asset Tagging Tools |
| Completion Period |
As per tender document |
| Quality Standards |
IS/IEC standards for electrical installations |