• Conduct detailed site survey and feasibility analysis for underground cable installation.
• Design the complete underground cable network system, including GIS mapping and asset tagging.
• Procure high-quality underground cables, GIS equipment, and necessary accessories as per specifications.
• Load, transport, and store all materials securely at the project site.
• Install underground cables, including trenching, laying, and backfilling, adhering to safety standards.
• Perform testing and commissioning of the underground network to ensure operational efficiency.
• Provide comprehensive documentation, including as-built drawings, GIS maps, and asset tags.
The process involves:
- Submission of technical and financial bids.
- Preliminary evaluation based on eligibility criteria.
- Technical evaluation and shortlisting.
- Price bid opening for qualified bidders.
Key specifications include:
| Parameter |
Requirement |
| Cable Type |
High Voltage Underground Cable |
| Voltage Level |
11kV |
| Mapping |
GIS & Geo Urja Mapping |
| Asset Tagging |
Unique identification tags |
| Completion Period |
As specified in tender documents |
All work must comply with applicable safety and quality standards, with project completion within the stipulated timeline.