• Conduct a detailed site survey and assessment of the existing overhead 11 kV line.
• Design an underground cable network with a ring main system suitable for the site.
• Procure all necessary materials, including high-voltage underground cables, GIS equipment, and accessories.
• Arrange transportation, loading, unloading, and storage of materials at the site.
• Execute excavation, laying, and installation of underground cables as per approved drawings.
• Install GIS mapping, Geo Urja mapping, and asset tagging systems.
• Perform testing, commissioning, and documentation of the entire system.
• Provide training and handover documentation to PGVCL.
The project must adhere to all safety, quality, and environmental standards specified in the tender documents. The completion period will be as per the attached schedule, with milestones for each phase of work. The contractor shall ensure minimal disruption to existing power supply during execution.