• Conduct detailed site survey including underground utility verification.
• Prepare comprehensive engineering designs for underground cable network conversion.
• Procure all necessary materials, equipment, and accessories as per technical specifications.
• Transport and unload materials at the designated site.
• Handle storage and ensure proper preservation of materials.
• Install underground cables, including trenching, laying, and jointing.
• Integrate GIS and Geo Urja Mapping systems for asset tagging and mapping.
• Perform testing and commissioning of the underground network.
• Document all activities, including as-built drawings and asset data.
The process includes:
- Site survey and utility verification.
- Engineering design approval.
- Procurement of materials.
- Transportation and storage.
- Installation of underground cables.
- GIS mapping and asset tagging.
- Testing, commissioning, and documentation.
| Item |
Specification |
| Cable Type |
XLPE insulated underground cables |
| Conductor Material |
Copper |
| Voltage Level |
LT (Low Tension) |
| GIS Mapping System |
Geo Urja developed by GUVNL |
| Asset Tagging |
RFID-based tags |
| Completion Timeline |
As per tender document attached |
All work must comply with applicable standards, safety protocols, and quality assurance procedures. The contractor shall ensure minimal disruption during installation and coordinate with utility authorities for utility verification and approvals.