BHEL Material Procurement: SCREW GRUB SOCKET M8X14 and BALANCING SHIMS ST01026/ST16002 2025
Bharat Heavy Electricals Limited (bhel)
VARANASI, UTTAR PRADESH
Bid Publish Date
09-Jan-2026, 10:28 am
Bid End Date
19-Jan-2026, 5:00 pm
Location
Progress
Quantity
4000
Category
FULLY FINISHED LOCKING PIECE AS PER DRG. NO. 41051901164 REV. 02 AND MAT. SPEC. HW 19584 REV. 03.
Bid Type
Two Packet Bid
Bharat Heavy Electricals Limited (BHEL) invites bids for the fully finished locking piece as per DRG. NO. 41051901164 REV. 02 and MAT. SPEC. HW 19584 REV. 03, and DRG. NO. 41051901165 REV. 01 with the same material specification. The procurement focuses on the supply of goods only, with lotwise delivery obligations. Lot 1 comprises 10 Nos per item delivering in 70 days from QAP approval at BHEL Bhopal; Lot 2 involves 1990 Nos per item delivering in 126 days from QAP approval or 56 days from Lot 1 acceptance, whichever is later. Documents such as drawings, QAP, and OEM declarations must be submitted within specified timelines.
Key Term 1: Lot-based delivery with 70 days and 126 days timelines from QAP approval
Key Term 2: Manufacturer-only evaluation for precision casting/investment casting methods
Key Term 3: 100% payment within 90 days of material receipt and acceptance; MSME concessions apply
Key Term 4: Mandatory QAP, drawing submission, and signed sample QAP for techno-commercial evaluation
Key Term 5: Post-delivery inspection at BHEL Bhopal; pre-dispatch inspection via BHEL-appointed TPIA
Key Term 6: Penalty for breach set at 10% of total contract value
Lot 1: 70 days from QAP approval; Lot 2: 126 days from QAP approval or 56 days from Lot 1 acceptance, whichever is later
100% payment within 90 days of receipt and acceptance; MSME-based concessions: 45 days for MSE, 60 days for Medium enterprises
Pre-dispatch inspection at vendor premises by BHEL TPIA; Post-receipt inspection at BHEL Bhopal QC; submit signed QAP and samples
Breach may lead to recovery of 10% of total contract value through financial remedies
Manufacturer status eligible (Precision casting/Investment casting) for tender evaluation
Submission of QAP, drawings, and OEM authorizations as required
Compliance with IS/QA standards specified in QAP and PQR (STE/DOC/2025/081 and 082)
Bharat Heavy Electricals Limited (bhel)
VARANASI, UTTAR PRADESH
Bharat Heavy Electricals Limited (bhel)
VARANASI, UTTAR PRADESH
Bharat Heavy Electricals Limited (bhel)
VARANASI, UTTAR PRADESH
Bharat Heavy Electricals Limited (bhel)
VARANASI, UTTAR PRADESH
Bharat Heavy Electricals Limited (bhel)
JHANSI, UTTAR PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Bidders must be the original Manufacturer (precision or investment casting) and submit drawings, QAP (STE/DOC/2025/081), and a signed sample QAP (STE/DOC/2025/082). Deliveries are lot-based: Lot 1 in 70 days from QAP approval; Lot 2 in 126 days (or 56 days after Lot 1 acceptance). Ensure SUVIDHA invoicing for payment processing.
Submit GST registration, PAN, experience certificates, financial statements, EMD documents, OEM authorizations, drawings, and QAP approvals. Include digitally signed invoices on SUVIDHA and ensure post-delivery inspection arrangements. Manufacturer certification is essential for evaluation.
Lot 1 delivery: 70 days from QAP approval at BHEL Bhopal. Lot 2 delivery: 126 days from QAP approval or 56 days after Lot 1 acceptance, whichever is later. Ensure all required documents are submitted within 15 days of PO approval and resubmission within 10 days.
Pre-dispatch inspection at vendor premises by BHEL-appointed TPIA is applicable if selected; Post-receipt inspection at BHEL Bhopal QC is mandatory. Ensure QAP is signed and samples provided for acceptance testing prior to dispatch.
Standard suppliers: 100% payment within 90 days of receipt/acceptance. MSE concession: 45 days; Medium enterprise: 60 days. All payments depend on material acceptance and SUVIDHA-uploaded invoices.
Bidders must comply with the QAP and PQR frameworks (STE/DOC/2025/081 and 082), provide OEM authorizations, and submit signed sample QAP. Only manufacturers in precision or investment casting are considered for technical evaluation.
Submit QAP drawings and sample QAP with bid as per STE/DOC/2025/081 and 082. Ensure documents are digitally signed and uploaded; resubmissions must occur within 10 days of BHEL comments. Final evaluation prioritizes conformity to tender drawings and material specs.
BHEL may recover 10% of the total contract value as a financial remedy for breach of contract. Ensure strict adherence to delivery timelines, QAP submissions, and post-delivery inspection requirements to avoid penalties.
Bharat Heavy Electricals Limited (bhel)
📍 JHANSI, UTTAR PRADESH
Advanced Weapons And Equipment India Limited
📍 KANPUR NAGAR, UTTAR PRADESH
Advanced Weapons And Equipment India Limited
Bharat Heavy Electricals Limited (bhel)
📍 BHOPAL, MADHYA PRADESH
Bharat Heavy Electricals Limited (bhel)
📍 HARIDWAR, UTTARAKHAND
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS