Panchayat Raj Uttar Pradesh High Mast Lighting Octagonal Tower with LED Flood System Tender 2026
Panchayat Raj
AURAIYA, UTTAR PRADESH
Bid Publish Date
11-Jul-2026, 5:21 pm
Bid End Date
20-Jul-2026, 5:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
The procurement is issued by the Block Development Office for the supply, installation, testing and commissioning of High Mast Lighting Octagonal Towers with LED Flood Lighting System (V2) in Azamgarh, Uttar Pradesh. The contract covers multiple installation sites, with on-site testing and demonstration in line with State/Central Government rules. Scope includes tower erection, electrical integration, and LED flood luminaires, with delivery period and option-clauses governing quantity adjustments up to 25%. Unique aspects include site visits by bidders at their own cost and joint liability for contract performance by bidders and any sub-contractors. This tender requires rigorous compliance with design and safety norms while enabling flexible quantity adjustments during contract execution.
High mast lighting tower with LED flood luminaires
Luminaire wattage and LED rating to be specified in design
Octagonal pole height and sheet thickness to meet wind load capacity
Base plate width, thickness and length to fit foundation design
Grades of high-tensile steel for pole construction
Cable size to meet electrical load requirements (sq mm)
On-site installation, testing and commissioning per government guidelines
Warranty duration to be defined during contract execution
Delivery quantity may shift by 25% with extended timeline
Site visits are mandatory at bidder's cost and risk
Scope includes supply, installation, testing, commissioning and warranty
Payment terms to be finalized in the contract; initial terms not specified in data.
Delivery period linked to original order; adjustments allowed up to 25% quantity with formula-based extension.
LD/penalty details not provided in the tender data; to be defined in contract terms.
Minimum three years experience in high mast lighting projects
Demonstrated turnover as specified in three-year financials
Compliance with electrical and safety standards for outdoor lighting installations
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2) (Q2)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Azamgarh
Delivery Pincodes
276121
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Saurabh Asthana | 276121,BLOCK DEVELOPMENT OFFICE BILARIYAGANJ | Azamgarh | Uttar Pradesh | 276121 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Panchayat Raj
AURAIYA, UTTAR PRADESH
N/a
KUSHINAGAR, UTTAR PRADESH
N/a
AZAMGARH, UTTAR PRADESH
N/a
AZAMGARH, UTTAR PRADESH
N/a
ETAWAH, UTTAR PRADESH
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Installation, testing and demonstration((Installation, testing and demonstration work at multiple locations shall follow as per the guidelines of State/Central Govt rules and regulations as applicable) | Yes,Including Civil Work at sites, Yes,Excluding civil work, No |
| GENERIC | No of LED Luminaires can be fitted in the carriage of each octagonal pole (in Nos) | 2, 3, 4, 6, 8 |
| GENERIC | Lantern carriage Diameter | 1000, 1200, 1500, 2000 Or higher |
| GENERIC | Onsite warranty (in years) | 1, 2, 3, 4, 5 Or higher |
| GENERIC | Height of Octagonal pole (in m) | 7, 8, 9, 10, 11, 12, 13, 16, 15 |
| Octagonal Pole Construction | Octagonal pole sheet thickness | 3, 4, 5 Or higher |
| Octagonal Pole Construction | Grades of High Tensile Steel | ISH430LA as per IS:5986 (Grade 355), ISH480LA as per IS:5986 (Grade 420), ISH550LA as per IS:5986 (Grade 490) |
| Base Plate | Width of Base Plate | 200, 250, 275, 300 Or higher |
| Base Plate | Thickness of Base Plate | 12, 16 Or higher |
| Base Plate | Length of Base Plate | 200, 250, 275, 300 Or higher |
| Wind Load | Regional wind withstand capacity which the pole structure support is suitable to withstand (in m/s) | 33, 39, 44, 47, 50, 55 Or higher |
| Electrical System, Cable and Cable connector | Size of Cable(in sq mm) | 1.5, 2.5, 4, 10, 16, 25 Or higher |
| LED Flood Light Luminaire | LED Rating/System Wattage/Rated Power (in Watts) | 80, 100, 120, 150, 180, 200, 250, 300, 350, 400 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar high mast lighting projects
Financial statements (last 3 years) demonstrating turnover
EMD/Security deposit documentation (as applicable by bid rules)
Technical bid documents showing compliance with LED luminaires and erection
OEM authorizations or approvals (if applicable)
Other standard bid submission certificates as per Terms and Conditions
Key insights about UTTAR PRADESH tender market
Bidders must prepare standard bid documents (GST, PAN, experience certificates, financials) and submit technical compliance with LED luminaire specs, pole construction and wind load requirements. Ensure turnover criteria are met for the last three years, and include OEM authorizations if applicable. Site-visit costs are bidder’s responsibility.
Submit GST certificate, PAN card, three-year financial statements, experience certificates for similar projects, EMD documentation, technical bid detailing installation and commissioning plan, and OEM authorizations. Provide safety certifications and company registration details as requested by Terms and Conditions.
The contract requires installation, testing and commissioning at multiple locations following State/Central Government guidelines. On-site demonstration is mandatory, and bidder must cover all costs for site visits. Testing includes electrical connection integrity and lighting performance per design specs.
Bidder must meet the minimum average annual turnover criterion for the last three years ending a date specified in the Terms, which ensures financial capability to execute supply, installation and commissioning of LED towers. Submit audited statements to prove turnover.
The purchaser may increase or decrease the order quantity by up to 25%. Extended delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days, impacting schedule and planning.
While specific standard codes aren’t fully disclosed, bidders should anticipate requirements around electrical safety, outdoor luminaire performance, and structural integrity for high mast towers. Provide documentation showing compliance with applicable norms and any OEM certification if required by contract.
Final payment terms are defined in the contract; typical government procurement arranges milestone-based payments after installation and testing, with possible advance and performance-linked components. Ensure you reference exact percentages and timelines in the bid to avoid disputes.
Bidders may visit installation sites at their own cost. Entry is allowed under indemnity terms protecting Buyer/Consignee from liability. Site familiarity helps accurate cost estimation for supply, installation and commissioning.
Block Development Office
📍 AZAMGARH, UTTAR PRADESH
Block Development Office
📍 AZAMGARH, UTTAR PRADESH
Block Development Office
📍 AZAMGARH, UTTAR PRADESH
Block Development Office
📍 AZAMGARH, UTTAR PRADESH
Block Development Office
📍 AZAMGARH, UTTAR PRADESH
Sign up now to access all documents
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS