Provn of 12 men living shelter,Electric items,Construction materials,PPR Items,Sanitary items
Indian Army
Bid Publish Date
26-Feb-2026, 1:02 am
Bid End Date
19-Mar-2026, 10:00 am
EMD
₹54,000
Progress
Quantity
7
Category
Provn of OR Living Shelter 40 Men
Bid Type
Two Packet Bid
The Indian Army under the Department of Military Affairs invites a bid for the Provn of OR Living Shelter 40 Men along with Electric items, Lightning Conductor with earthing, User Manual, Sanitary items. The tender carries an EMD of ₹54,000 and outlines a flexible quantity clause allowing ±50% variation at contract award and during currency. The scope indicates multiple product lines (shelter provisions, electrical fittings, safety groundwork) without listed BOQ specifics. This procurement targets suppliers capable of integrating living quarters with essential electrical and sanitary components, supported by the mandatory ATC terms and option-driven delivery planning. The bid requires adherence to delivery timelines aligned to order extensions and extended periods, with price adjustments kept within contracted rates. The opportunity is shaped by a uniform delivery framework and readiness to scale if required under the option clause.
OR Living Shelter 40 Men
Electric items, Lightning Conductor with earthing
User Manual, Sanitary items
EMD ₹54,000
Quantity variation up to ±50%
Delivery timeline linked to original and extended orders
Option Clause allows ±50% quantity change at contract and during currency
Delivery period starts from last date of original delivery order; extended periods apply
EMD amount fixed at ₹54,000; ATC terms must be complied with
No explicit payment terms stated; bidders should confirm standard Govt payment within 30-45 days post acceptance per tender norms.
Delivery period commences from last date of original order; additional time calculated by (increased quantity/original quantity) × original delivery period, minimum 30 days.
Not specified; bidders should seek ATC clarification on LD or performance bond requirements.
Experience in supplying military shelter or related electrical items
Demonstrated financial stability (recent financial statements)
Compliance with basic GST/PAN requirements and safety standards
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
LEH, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Provn of OR Living Shelter 40 Men | Specification att Annx I | 1 | annx i | epo_xv | 60 |
| 2 | Electric items | Specification att Annx I | 1 | annx i | epo_xv | 60 |
| 3 | Lightening Conductor with earthing | Specification att Annx I | 2 | annx i | epo_xv | 60 |
| 4 | User Manual | Specification att Annx I | 2 | annx i | epo_xv | 60 |
| 5 | Sanitary items | Specification att Annx I | 1 | annx ii | epo_xv | 60 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates for similar shelter/electric item provisioning
Financial statements (last 2-3 years)
EMD submission proof (₹54,000)
Technical bid documents and OEM authorizations (if applicable)
ATC compliance documents uploaded by Buyer
Any safety or installation certificates relevant to electrical items
Bidders must submit GST certificate, PAN card, experience certificates for similar projects, financial statements, EMD of ₹54,000, technical bid documents, and OEM authorizations if applicable, plus ATC-compliant documentation as specified.
The option clause allows ±50% quantity change at contract award and during currency. Delivery time adjusts proportionally, with a minimum extension of 30 days, based on the formula provided in the tender terms.
Scope includes OR Living Shelter for 40 men, electric items, lightning conductor with earthing, user manuals, and sanitary items. No detailed BOQ is provided; bidders should align bids with ATC terms and safety standards during submission.
Delivery begins after the original delivery order date; any extended period follows the extended delivery time formula, ensuring a minimum 30 days for any additional quantity or timeframe.
The required EMD is ₹54,000. Payment terms are not explicitly stated; bidders should anticipate standard Govt norms and request ATC clarification for payment milestones and acceptance criteria.
No explicit standards are listed; bidders should reference ATC terms and prepare to demonstrate compliance with applicable safety norms for shelter construction and electrical fittings.
Indian Army
Indian Army
Indian Army
Indian Army
Indian Army
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS