TenderDekho Logo
GEM

Indian Army Refined Sunflower Oil (V4) Defence Tender Pathankot Punjab DFS 423-2025 2026

Bid Publish Date

30-Jun-2026, 7:58 pm

Bid End Date

10-Jul-2026, 8:00 pm

EMD

₹73,625

Progress

Issue30-Jun-2026, 7:58 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

13159

Bid Type

Two Packet Bid

Categories 2

Tender Overview

Indian Army (Department Of Military Affairs) invites bids for Refined Sunflower Oil (V4) under a Defence category in Pathankot, Punjab. The tender specifies packaging conforming to DFS 423-2025 and requires compliance with the governing specifications related to oil types and technical requirements. A non-representative BOQ exists, with an EMD of ₹73,625. The purchaser reserves option to modify quantity up to 50% both at order and during contract, with delivery periods linked to the original delivery date and adjusted per formula. This opportunity targets suppliers capable of meeting defence-grade packaging and specification standards, with structure for extending delivery time under defined conditions.

Technical Specifications & Requirements

  • Product/service: Refined Sunflower Oil (V4) for Defence (Q3 category) supplied to Indian Army.
  • Packaging: DFS 423-2025 conforming packaging and labeling.
  • Governing specs: Compliance with stated governing specifications and oil-type classifications.
  • EMD: ₹73,625 (security deposit to accompany bid).
  • BOQ status: No items listed in current BOQ; focus on packaging and compliance rather than quantity-driven line items.
  • Standards/Compliance: Oil-type compliance and packaging standards must be demonstrated; explicit IS/ISO codes are not disclosed in available data.
  • Delivery/Contract flexibility: Option to increase/decrease quantity by up to 50%, with pro-rata extension rules if exercised.
  • Tender scope context: Defence sector sourcing with strict packaging requirements and adherence to DFS 423-2025 mandates.

Terms, Conditions & Eligibility

  • EMD: ₹73,625 to accompany bid.
  • Quantity flexibility: Up to 50% increase/decrease during order and currency of contract.
  • Delivery timeline: Calculated extension time based on (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
  • Delivery start rules: From the last date of original delivery order; extensions start from extended period end date.
  • Compliance: Bidder must comply with all Buyer Added Terms and ensure packaging per DFS 423-2025.
  • ATC/ATD documents: Refer to uploaded ATC for any additional terms and conditions.
  • Contract execution: Standard defence procurement terms apply; ensure readiness for defence-grade packaging and oil-type compliance.
  • Bidder obligations: Adhere to option clause and ensure capacity to scale quantity within defined limits.

Key Specifications

  • Product/Service: Refined Sunflower Oil (V4) for Defence

  • EMD: ₹73,625

  • Packaging: DFS 423-2025 compliant

  • Governing Specifications: Compliance with stated technical requirements for oil types

  • BOQ: No items listed; emphasis on packaging and compliance rather than unit quantities

Terms & Conditions

  • Option to adjust quantity up to 50% at placement and during currency

  • Delivery period calculated with minimum 30 days extension rule

  • Packaging to DFS 423-2025; strict compliance with governing specs

Important Clauses

Payment Terms

Not specified in available data; standard defence procurement terms apply; bid submission must include EMD ₹73,625

Delivery Schedule

Delivery commencement from last date of original delivery order; extension time formula applies with minimum 30 days

Penalties/Liquidated Damages

Not explicitly stated; reference to option clause and delivery timing terms in buyer terms

Bidder Eligibility

  • Must meet EMD requirement of ₹73,625

  • Able to supply Refined Sunflower Oil (V4) with DFS 423-2025 packaging

  • Compliance with governing oil-type specifications and defence procurement terms

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Refined Sunflower Oil (V4) (Defence) (Q3)

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9478372.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Indian Army Refined Sunflower Oil (V4) Defence Food Specification Tender 2026 – DFS 423-2025 Packaging

Indian Army

PATIALA, PUNJAB

Posted: 16 March 2026
Closed: 23 March 2026
GEM

Indian Army Refined Sunflower Oil (V4) Defence Tender Patiala Punjab 2026 BIS/FSSAI Standards

Indian Army

PATIALA, PUNJAB

Posted: 12 June 2026
Closed: 19 June 2026
GEM

Indian Army Refined Sunflower Oil Tender Udhampur Jammu & Kashmir 2026 – DFS 423-2025 Packaging, EMD ₹101,896

Indian Army

UDHAMPUR, JAMMU & KASHMIR

Posted: 17 March 2026
Closed: 28 March 2026
GEM

Indian Army Refined Sunflower Oil (V4) Defence Tender Udhampur Jammu & Kashmir 2026 DFS 423-2025

Indian Army

UDHAMPUR, JAMMU & KASHMIR

Posted: 17 March 2026
Closed: 28 March 2026
GEM

Indian Army Refined Sunflower Oil Tender Sonitpur Assam 2026 - DFS 423-2025 Packaging, FSSAI/BIS, EMD ₹165537

Indian Army

SONITPUR, ASSAM

Posted: 11 April 2026
Closed: 22 April 2026
GEM

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Compliance Governing Specifications/Technical Requirements Compliance to Defence Food Specifications No 423 - 2025 Issued By Secretariat Of The Technical Standardisation Committee (Food Stuffs) (Directorate General Of Supplies And Transport) (Copy Attached)
Compliance Oil Types Solvent Extracted
Compliance Governing specification has been seen, read and understood Yes
Packaging and Marking Packaging Type conforming to DFS 423 - 2025 1 Litre Polypouch, New 15 Kg square tin

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about PUNJAB tender market

How to bid for the Indian Army refined sunflower oil tender Pathankot?

Bidders must submit an EMD of ₹73,625, comply with DFS 423-2025 packaging, and demonstrate oil-type compliance. Ensure readiness with governing specs and ATC documents; the option clause allows quantity adjustments up to 50%, with delivery terms aligned to the original order date.

What documents are required for defence sunflower oil procurement in Punjab?

Required documents include GST registration, PAN, experience certificates for similar oil supply, financial statements, EMD submission proof, technical bid documents, and OEM authorizations. Also attach packaging compliance certificates and any IS/ISO standards if specified in ATC.

What are the technical specifications for DFS 423-2025 packaging?

Packaging must conform to DFS 423-2025 specifications; suppliers should provide packaging design details, labeling, material safety data, and proof of compatibility with refined sunflower oil (V4) for defence use. Include tamper-evident features and shipping marks per DFS standard.

When is the delivery extension allowed for quantity adjustments?

Delivery extension is calculated as (Additional quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days. The purchaser may extend to the original delivery period when exercising the option clause.

What is the EMD amount for the Pathankot oil tender 2026?

The Earnest Money Deposit is ₹73,625. Bidder must provide EMD as per the tender terms, typically via online payment or demand draft, along with bid submission.

Which standards govern the refined sunflower oil for defence procurement?

Governing specifications require the oil-type to be compliant with the stated standards; packaging must meet DFS 423-2025. Suppliers should demonstrate ISI/ISO equivalents if referenced in ATC and ensure traceability of oil type.

Similar Tenders

5 found

Indian Army Refined Sunflower Oil (V4) Defence Tender Pathankot Punjab DFS 423-2025 2026

Indian Army

📍 Pathankot, PUNJAB

EMD: ₹73,625
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Indian Army Refined Sunflower Oil (V4) Defence Tender Chennai Tamil Nadu 2026 - DFS 423-2025 Packaging & FSSAI BIS Compliance

Indian Army

📍 CHENNAI, TAMIL NADU

⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM
Urgent

Indian Army Refined Sunflower Oil (V4) Defence Tender Chennai Tamil Nadu 2026 – DFS 423-2025 Packaging & BIS/FSSAI Compliance

Indian Army

📍 CHENNAI, TAMIL NADU

⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM
Urgent

Indian Army Refined Sunflower Oil Tender Haridwar Uttarakhand 2026 IS 550 BIS FSSAI

Indian Army

📍 HARIDWAR, UTTARAKHAND

EMD: ₹3.5 L
⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM

Indian Army Refined Sunflower Oil (V4) Tender Assam Dhemaji 2026 – DFS 423-2025 Packaging, FSSAI/BIS

Indian Army

📍 DHEMAJI, ASSAM

EMD: ₹63,386
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM