GENR SET 40 KVA
Indian Army
BUDGAM, JAMMU & KASHMIR
Bid Publish Date
30-Jun-2026, 8:16 pm
Bid End Date
21-Jul-2026, 10:00 am
EMD
₹1,02,000
Location
Progress
Quantity
4
Bid Type
Two Packet Bid
The Indian Army (Department Of Military Affairs) invites bids for the Supply-installation-testing-commissioning of a 40 KVA generator set in Allahabad, Uttar Pradesh 210010. The scope includes all cost components to deliver, install, test, and commission the genset. An EMD of ₹102,000 applies. The award hinges on compliance with certificates, ISO 9001 status, and material test certificates. A pre-supply advance sample approval is required, with a 10-day submission window post-award and a 10-day feedback cycle for modifications. The tender emphasizes conformity to buyer lab acceptance via material test results and potential delivery timeline adjustments if sample approval is delayed. Unique elements include the sample approval process and mandatory ISO certification, with OEM turnover criteria to be fulfilled for bid validity.
Product/service names and category: 40 KVA generator set
Scope: Supply, Installation, Testing and Commissioning
Standards: ISO 9001 (bidder or OEM)
Quality/testing: Material Test Certificate; buyer lab acceptance criteria
Sample: 16/9 samples within 10 days of award; modification list within 10 days
Delivery/installation terms: subject to sample approval; LD/adjustment if delayed by buyer
Turnover criteria: as per bid document (exact figure not provided)
EMD ₹102000 required with bid submission
ISO 9001 certification mandatory for bidder or OEM
Advance sample approval process with 16/9 samples within 10 days
Material Test Certificate to accompany delivery and be lab-tested
Turnover criteria must be satisfied as specified in bid document
Bid price must include all costs for supply, installation, testing and commissioning; no separate payment breakdown provided here
Delivery timeline tied to advance sample approval; if buyer delays approval, delivery period is reset without LD
Not explicitly stated here; potential LD may apply per contract framework based on delays post-sample approval
Minimum turnover as per bid document (last 3 years) - exact figure not disclosed here
ISO 9001 certification held by bidder or OEM
Possession of Material Test Certificate and ability to pass buyer lab tests
Successful submission of 16/9 advance samples within 10 days of award
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Genr Set 40 KVA
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
12
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Allahabad
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Allahabad | Allahabad | - | - | 4 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BUDGAM, JAMMU & KASHMIR
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
Indian Army
DARJEELING, WEST BENGAL
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Audited financial statements or CA certificate showing turnover (last 3 years)
EMD submission proof (DD/online payment receipt)
ISO 9001 certificate ( bidder or OEM )
Material Test Certificate for supplied items
OEM authorization letter (if applicable)
Technical bid documents and any ATC/corrigendum
Evidence of prior experience in similar genset supply/installation (if required)
Key insights about UTTAR PRADESH tender market
Bid preparation requires EMD ₹102000, ISO 9001 certification (bidder or OEM), and Material Test Certificate. Include samples (16/9) within 10 days of award, with lab-tested acceptance. Ensure bid documents match ATC, Corrigendum and turnover criteria stated in the bid document.
Submit GST, PAN, audited financials or CA certificate showing turnover, EMD proof, ISO 9001 certificate, Material Test Certificate, OEM authorization if applicable, and technical bid documents along with any ATC or corrigendum.
The tender specifies a 40 KVA genset with scope including supply, installation, testing and commissioning; ISO 9001 certification is mandatory; material test certificate required. Details beyond these are not provided in the data; bidders should prepare for lab tests and sample approvals.
Advance samples (16/9) must be submitted within 10 days of award. Buyer will approve or provide modification list within 10 days of receipt. If buyer delays approval, the delivery period is reset without LD for the delay.
The EMD amount is ₹102,000. Ensure payment via the prescribed mode and attach proof with the bid. EMD safeguards the procurement process and supports bid validity under the tender terms.
The OEM turnover must meet the minimum average annual turnover for the last three years as indicated in the bid document. If OEM is under 3 years old, turnover is calculated after incorporation; exact figure is in the bid document.
A Material Test Certificate must accompany the supply, and the item will be checked by the buyer’s laboratory; acceptance relies on lab results, making testing a critical acceptance factor for the genset procurement.
If approval is delayed, the delivery period is reset without LD for the period of the delay. Bidders should plan for potential schedule shifts and coordinate with the buyer to minimize impact.
Indian Army
📍 MEERUT, UTTAR PRADESH
Indian Army
📍 JHANSI, UTTAR PRADESH
Indian Army
📍 MEERUT, UTTAR PRADESH
Indian Army
📍 MATHURA, UTTAR PRADESH
Indian Army
📍 MATHURA, UTTAR PRADESH
Sign up now to access all documents
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS