ARMATURE ASSY,FIELD COIL ASSY,DRIVE ASSY 24V,BRUSH CARRIER PLATE,BUSH SET
Indian Army
AMRITSAR, PUNJAB
Bid Publish Date
29-Jun-2026, 8:25 am
Bid End Date
09-Jul-2026, 9:00 am
Progress
Quantity
9
Category
AVR
Bid Type
Single Packet Bid
The opportunity is issued by the Indian Army under the Department Of Military Affairs for procurement across multiple component categories, including AVR, Armature Assembly, Field Coil Assembly, Brush Plate Assembly, DE Bracket Assembly, and Carbon Bushes. The scope specifies the bid price should cover only the supply of goods, with a quantity variation option up to 25% at contract award and during the contract currency. Local suppliers are prioritized for delivery ease and after-sales service. The BOQ lists 6 items, all marked as N/A, indicating a broad or indeterminate quantity at this stage.
No formal product specifications are provided in the tender data. Available information confirms the following: - Categories include AVR, Armature Assembly, Field Coil Assembly, Brush Plate Assembly, DE Bracket Assembly, Carbon Bushes. - Scope: Only supply of Goods. - Quantity variation: up to 25% of bid/contract quantity. - Delivery timing is calculated from the original or extended delivery period with a minimum of 30 days in extended scenarios. - Local suppliers are preferred for ease of delivery and after-sales service. - No explicit EMD amount, standards, or installation requirements are specified here.
Key terms emphasize supply flexibility and vendor selection preferences: - Option Clause allowing ±25% quantity variation during and after contract; delivery period adjustments governed by a formula with minimum 30 days. - Scope limited to the supply of Goods; no services or installation. - Buyer ATC notes prioritize local supplier accessibility. - No explicit EMD, payment terms, or warranty details appear in the provided data. - Bidders should rely on organization’s ATC terms for compliance.
Option to adjust quantity up to 25% during or after contract
Scope limited to supply of goods; no installation services
Local supplier preference for delivery and after-sales
Delivery period relies on original last delivery date with potential extensions
ATC clauses govern changes in quantity and delivery
Not stated in data; ATC notes specify scope is supply-only; bidders should review final ATC for payment terms
Delivery period starts from last date of original delivery order; extended period calculated per option clause with minimum 30 days
No LD details provided in given data; refer to ATC for any penalties or performance bonds
Eligible bidders must be capable of supplying AVR and related assemblies
Preference given to local suppliers for delivery and after-sales service
Submit bid as a supply-only contract with no installation services
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
AVR , Armature Assy , Field Coil Asssy , Brush Plate Assy , DE Bracket Assy , Carbon Bushes
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
AMRITSAR, PUNJAB
Indian Army
Armed Forces Tribunal
Indian Army
SONITPUR, ASSAM
Indian Army
LEH, JAMMU & KASHMIR
Tender Results
Loading results...
AVR
Spare parts of 5.5 KVA Gen Set
Armature Assy
Spare Parts of Tractor
Field Coil Asssy
Spare Parts of Tractor
Brush Plate Assy
Spare Parts of Tractor
DE Bracket Assy
Spare Parts of Tractor
Carbon Bushes
Spare Parts of Tractor
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | AVR | Spare parts of 5.5 KVA Gen Set | 1 | nos | manojkumar@555 | 15 | |
| 2 | Armature Assy | Spare Parts of Tractor | 1 | nos | manojkumar@555 | 15 | |
| 3 | Field Coil Asssy | Spare Parts of Tractor | 1 | nos | manojkumar@555 | 15 | |
| 4 | Brush Plate Assy | Spare Parts of Tractor | 1 | nos | manojkumar@555 | 15 | |
| 5 | DE Bracket Assy | Spare Parts of Tractor | 1 | nos | manojkumar@555 | 15 | |
| 6 | Carbon Bushes | Spare Parts of Tractor | 4 | nos | manojkumar@555 | 15 |
Discover companies most likely to bid on this tender
GST registration certificate (if referenced in terms)
Permanent Account Number (PAN) card
Experience certificates relevant to AVR/Armature components
Financial statements or turnover evidence
EMD/Security deposit documentation (if applicable in ATC terms)
Technical bid documents demonstrating product capability
OEM authorizations or approvals (if required by ATC)
Any other bidder-submission documents explicitly called out in Terms and Conditions
Bidders should submit a goods-only supply bid, acknowledge the 25% quantity variation option, and comply with ATC terms. Ensure GST, PAN, and experience evidence are ready, plus any OEM authorizations. Review local-supplier preference notes and provide delivery capability details within the bid response.
Required documents typically include GST certificate, PAN card, experience certificates for AVR/armature work, financial statements, EMD documentation if applicable, technical bid demonstrating capability, and OEM authorizations. Confirm exact list in the final Terms and Conditions for this tender.
The procurement covers AVR, Armature Assembly, Field Coil Assembly, Brush Plate Assembly, DE Bracket Assembly, and Carbon Bushes. The scope is limited to supply of goods with emphasis on potential local supplier participation and delivery readiness.
Delivery periods begin from the original last delivery order date. If the option clause extends quantity, the extra time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
The clause allows the purchaser to increase or decrease the quantity up to 25% at contract placement and during currency at contracted rates. This impacts fulfillment planning, inventory, and pricing considerations for bidders.
ATC terms indicate a preference for local suppliers to facilitate easier product delivery and after-sales service, influencing bidder selection and logistical arrangements for Army procurement.
N/A in BOQ suggests contingent or undefined quantities at bidding. Bidders should prepare flexible capacity and pricing strategies, and await final quantity orders post-contract, ensuring readiness to scale within 25% variation.
The tender data does not specify standards; bidders must rely on final ATC for any required certifications, OEM authorizations, and compliance criteria related to AVR and related assemblies.
Indian Army
📍 KANGRA, HIMACHAL PRADESH
Indian Army
📍 DEHRADUN, UTTARAKHAND
Indian Army
📍 AMRITSAR, PUNJAB
Armed Forces Tribunal
📍 LEH, JAMMU & KASHMIR
Indian Army
📍 DEHRADUN, UTTARAKHAND
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS