Panchayati Raj Department Bihar RO Plant with Genset and Trolley Tender Bhojpur 2026
Panchayati Raj Department
BHOJPUR, BIHAR
Progress
Quantity
1
Bid Type
Two Packet Bid
Rural Development Department Bihar invites bids for a RO Plant with Genset and Trolley to serve Munger (811201). The procurement scope focuses on a packaged water treatment solution featuring a reverse osmosis plant, integrated genset, and trolley-mounted assembly. While the quotation window and estimated value are not disclosed, the tender emphasizes warranty coverage on spare parts and the complete system. A key procurement facet is the option clause permitting up to 25% quantity variation at contracted rates, with delivery adjustments calculated against the original schedule and a minimum extension of 30 days. This opportunity requires bidders to align with local supply and standard installation practices for rural water infrastructure. The absence of BOQ items suggests a streamlined or single-line requirement, with emphasis on compliant delivery and service support.
Product/service: RO Plant with Genset and Trolley
Warranty: spare parts and whole system
Delivery: terms tied to last delivery order date; option clause for quantity changes
Location: Munger, Bihar (811201)
OEM/Brand requirements: not specified in current data
Standards: not explicitly stated
Quantity variation up to 25% at contracted rates
Delivery period adjusts with option clause; minimum 30-day extension
Warranty coverage on spare parts and entire RO plant system
Purchaser may increase/decrease bid quantity by up to 25% during contract; extended delivery period calculated as (Increase/Original) × Original period, minimum 30 days
Delivery starts from the last date of the original delivery order; extension terms apply under option clause
Warranty on spare parts and on the entire RO plant with genset and trolley; post-installation support implied
Experience in supplying/commissioning RO water treatment plants
Demonstrated post-installation service capability in rural setups
Financial capacity or solvency to support phased delivery
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
RO Plant with Genset and Trolley (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Panchayati Raj Department
BHOJPUR, BIHAR
Panchayati Raj Department
BHOJPUR, BIHAR
Rural Development Department
KISHANGANJ, BIHAR
Panchayati Raj Department
VAISHALI, BIHAR
Rural Development Department
WEST CHAMPARAN, BIHAR
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Warranty/Services | Warranty on spare parts | 6, 12, 18, 24 Or higher |
| Warranty/Services | Warranty on whole items supplied | 1, 2, 3, 4, 5 Or higher |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar RO plant deployments
Financial statements or solvency documents
EMD payment proof (if applicable in official terms)
Technical bid/compliance certificates for RO plant with genset
OEM authorization or dealership certificate for RO components
Installation and maintenance capability documents
Key insights about BIHAR tender market
Bidders should prepare documentation per Terms and Conditions, including GST, PAN, experience certificates, and OEM authorizations. Ensure compliance with warranty requirements for spare parts and whole plant, and be ready to accept quantity variation up to 25%. Submit the technical bid with installation plan and post-sales support details.
Required documents include GST registration, PAN, financial statements, experience certificates for similar RO deployments, OEM authorization, installation/maintenance capability, and any EMD proof if stipulated. Prepare technical compliance certificates for the RO plant with genset and trolley.
The tender mandates a warranty on spare parts and on the entire RO plant system. Bidders must provide a warranty duration and terms for replacement parts, along with post-installation support, service response times, and availability of spares for rural deployment.
Delivery schedule begins from the last delivery order date. If the option clause is activated, the additional time equals (increased quantity ÷ original quantity) × original delivery period, with a minimum extension of 30 days.
The purchaser reserves the right to vary quantity up to 25% of bid quantity at contracted rates. During currency, the variation remains at 25% with delivery time adjustments as specified in the option clause.
Brand/OEM requirements are not explicitly stated in the current data. Bidders should reference OEM authorizations and ensure compatibility of RO plant, genset, and trolley with standard rural water infrastructure installations.
Eligible bidders should demonstrate experience in delivering RO water treatment systems, provide financial solvency documentation, possess GST and PAN, and submit OEM authorization where applicable. Post-sales service capability for rural deployments is essential.
Include a detailed warranty schedule covering spare parts and the entire plant, specify replacement timelines, and present a certified service support plan. Attach service agreements, contact centers, and spare parts availability to meet rural installation needs.
Panchayati Raj Department
📍 BEGUSARAI, BIHAR
Rural Development Department
📍 MUNGER, BIHAR
Rural Development Department
📍 MUNGER, BIHAR
Siwan District Panchayats
📍 SARAN, BIHAR
Rural Development Department
📍 MUNGER, BIHAR
Sign up now to access all documents
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS