The technical specifications require bidders to adhere to IS standards for road construction, including IS 456, IS 2720, and relevant codes for bridges and structures. The project must incorporate durable materials capable of withstanding regional climate conditions. Construction procedures should follow best practices for earthwork, compaction, and structural integrity.
| Parameter |
Specification |
| Material |
As per IS standards |
| Pavement Thickness |
Minimum 300 mm |
| Bridge Construction |
As per approved design drawings |
| Drainage |
Adequate to prevent water logging |
| Testing |
Soil compaction, material quality, and structural integrity tests at specified intervals |
The process involves site assessment, design approval, material procurement, construction, quality testing, and final inspection, ensuring compliance with all technical norms and safety regulations.