Detailed Design Consultancy Services for Surat Metro Extension of Corridor II - Phase I to Mumbai-Surat High Speed Rail Corridor (HSR), Elevated Viaduct (4.4 Km), Elevated Station (3 Stations) Including Viaduct Portion within the Stations and Transition Spans on Either Side of the Stations in connection with Surat Metro Rail Project Phase - 1
GM - Contract
GANDHINAGAR, GUJARATPosted 23 Sept24 Months
₹3.4 Cr
NPROCURE8 DocumentsOpen
Category: Consultancy Services
Deadline
23 Oct 2026